Workflow:
Public
Monday, December 7th, 2009

The project to create nine new sewer connections on Hill Street in Danville has been canceled. Currently, residents there have their own private septic systems, but the selectboard thought that it would be possible to connect them to the public sewers at an affordable cost.
According to Town Administrator Mert Leonard, the cost estimate that they received was much larger than expected.
Currently in Lyndonville
54°
Cloudy
Cloudy
"newsLINC" is produced in collaboration with News 7 through Lyndon State Colleges' Dept. of Television Studies in Lyndonville, Vermont. This e-journalism project is made possible through the generosity of AT&T."




